Skip to content

Solar installation

Power that pays for itself, sized for what you actually use.

30-day load audit. Then we quote.

Most solar installers quote a system size from the roof area or from your last electricity bill. We ask for thirty days of measured load data, then size the system to match. Result: shorter payback, smaller battery, less wasted capacity.

What we offer

The full solar installation stack — quoted as a single engagement.

Load audit + 30-day baseline

We meter your actual draw for thirty days before we quote. Most homeowners are pitched 30–40% larger than they need.

PV panel install

Tier-1 panels, racking sized for local wind loads, structural assessment of the roof before anything is bolted down.

Inverter sizing

Grid-tie, off-grid, or hybrid configuration. Sized to actual array, not nameplate-rounded up.

Battery storage

Lithium iron phosphate (LFP) defaults — longer lifecycle, safer chemistry. Capacity sized to overnight critical loads, not whole-house heroism.

Net metering + permits

We file the utility paperwork, handle inspection coordination, and provide the documentation pack for resale of the property later.

Performance monitoring

Web + mobile monitoring of generation and consumption. 5-year service plan with annual performance review and panel cleaning.

Process

How the engagement runs.

Every service line follows the same five-stage rhythm so you know exactly where the project is at any moment — and what we're responsible for next.

  1. Site visit + load measurement

    Roof inspection, shading assessment, and a meter installed for 30 days to baseline your actual load.

  2. Sized quote with payback projection

    Three system sizes presented with payback calculation under conservative tariff assumptions. You pick.

  3. Permits + utility approval

    We file the interconnection paperwork (where applicable) and coordinate the utility's inspection.

  4. Roof prep + install

    1–3 days residential, longer for complex commercial roofs. Roof structure verified before mounting.

  5. Commissioning + monitoring setup

    Inverter commissioning, app setup, walkthrough of the dashboard. You see generation and consumption from day one.

Pricing & quotes

Every solar installation engagement is quoted to the property.

We don't publish a price list because the same brief on a different property has a different scope. Free site visit, written scope, fixed quote within 48 hours.

Common questions

What people ask before booking solar installation.

Typical residential payback is 5–7 years for grid-tied, 7–9 years for hybrid (with battery). We provide a payback projection per quote based on your tariff and your measured load.